PLEASE ENSURE YOU PROVIDE YOUR
EMAIL ADDRESS WHEN YOU CHECK-OUT !
Please call us at 1-252-972-7703 if you wish to expedite your order
PLEASE ENSURE YOU PROVIDE YOUR
EMAIL ADDRESS WHEN YOU CHECK-OUT !
DISCLAIMER:
The details offered here are for the sole purpose of reducing drawing time, providing clarity and uniformity, and aiding municipal engineers in development of their own standard details. These details were prepared under the responsible charge of a North Carolina licensed Professional Engineer and were originally issued and sealed by Bobby L. Joyner, PE, NC Registration 08421, from time to time. These media shall not be considered certified documents. It is the responsibility of the engineer using these media to review the detail(s) in order to verify and/or modify the detail(s) to meet the requirements of the specific project and that the detail(s) should be signed and sealed by the project engineer in responsible charge of the project for which the detail(s) is intended.
THESE DOCUMENTS/DETAILS ARE COPYRIGHTED:
The documents/details provided on this site are copyrighted by Appian Consulting Engineers, PA, 841 S. Wesleyan Blvd, Rocky Mount, NC 27803, USA, all rights reserved. Once
procured, they may not be marketed or resold without permission or license from Appian. This
PDF is for evaluation purposes only:
The details offered
here are for the sole purpose of reducing drawing time, providing clarity and
uniformity, and aiding municipal engineers in development of their own standard
details. These details were prepared under the responsible charge of a North
Carolina licensed Professional Engineer and were originally issued and sealed by
Bobby L. Joyner, PE, NC Registration 08421, from time to time. These media
shall not be considered certified documents. It is the responsibility of the
engineer using these media to review the detail(s) in order to verify and/or
modify the detail(s) to meet the requirements of the specific project and that
the detail(s) should be signed and sealed by the project engineer in responsible
charge of the project for which the detail(s) is intended. |